{"id":57,"date":"2017-07-03T13:53:35","date_gmt":"2017-07-03T13:53:35","guid":{"rendered":"http:\/\/www.dasoluciones.es\/en\/?page_id=57"},"modified":"2017-08-20T12:32:27","modified_gmt":"2017-08-20T12:32:27","slug":"system-monitoring-projects","status":"publish","type":"page","link":"http:\/\/www.dasoluciones.es\/en\/services\/system-monitoring-projects\/","title":{"rendered":"System Monitoring Projects"},"content":{"rendered":"<h6 align=\"justify\">&nbsp;<\/h6>\n<hr>\n<p align=\"justify\">Typically, a machinery asset condition monitoring project begins with the technical specification phase.&nbsp;It is followed by the design of the solution that best fits this specification, and then the selection of different hardware elements, which may come from one or multiple manufacturers.&nbsp;The implementation of the monitoring system is the next phase, which sometimes coincides with the final phase which consists of commissioning and training.<\/p>\n<p align=\"justify\"><strong><em>At D&amp;A we participate in all phases of monitoring, if required by the client or the project.<\/em><\/strong>&nbsp;However, we also participate in isolated or concrete phases, depending on the needs in each case.&nbsp;In the design phase, the generation of good documentation in terms of detail, wiring and assembly plans, test procedures, etc.&nbsp;is essential to avoid delays and problems during start-up.&nbsp;For D&amp;A, the start-up or implantation begins with the FAT factory tests (Factory Acceptance Test).&nbsp;Proper design of the tests will allow problems that may arise during the SAT (Site Acceptance Test)&nbsp; to be anticipated before start-up tests.&nbsp;For us, these are aspects of special relevance in all the projects in which we are involved.<\/p>\n<p align=\"justify\">&nbsp;<\/p>\nngg_shortcode_0_placeholder\n<p align=\"justify\">&nbsp;<\/p>\n<p align=\"justify\"><strong><em>We are convinced that<\/em><\/strong>&nbsp; &nbsp;<strong><em>it is the small details that make the implementation of a monitoring system simple and meet the objectives of a project, so we devote special attention to&nbsp;<\/em><\/strong><em><strong>these<\/strong>.<\/em><\/p>\n<p align=\"justify\">The condition monitoring systems in which we work on can be large, such as the monitoring of the waterworks of the Victoria Falls in Zambia, with more than 70 channels;&nbsp;or small, such as the monitoring of one or two measurement directions in a bearing of a machine.&nbsp;In&nbsp;<em>both<\/em>&nbsp;cases,&nbsp;<strong><em>the quality of work as the fulfillment of the objectives of the project is a priority for the people at D&amp;A.<\/em><\/strong>&nbsp;<strong>We<\/strong>&nbsp;<strong><em>do not establish differences between large and small systems, each one is given maximum dedicated&nbsp;<\/em><\/strong><em><strong>attention<\/strong>.<\/em><\/p>\n<p align=\"justify\">Sometimes a project requires the design of a solution or the creation of a prototype tailored for the collection and evaluation of the data to be analyzed.&nbsp;At D&amp;A we also assume this type of challenge.&nbsp;<em><strong>The<\/strong><\/em>&nbsp;<strong><em>integration of hardware components and software design solutions based on LabView<\/em><\/strong>&nbsp;<strong><em>are&nbsp;just&nbsp;one of the products that&nbsp;we&nbsp;offer to our customers<\/em><\/strong> for asset monitoring solutions and industrial processes.<\/p>\n<hr>\n<p align=\"justify\">&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; Typically, a machinery asset condition monitoring project begins with the technical specification phase.&nbsp;It is followed by the design of the solution that best fits this specification, and then the selection of different hardware elements, which may come from one or multiple manufacturers.&nbsp;The implementation of the monitoring system is the next phase, which sometimes coincides&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":40,"menu_order":3,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"ngg_post_thumbnail":0,"jetpack_post_was_ever_published":false,"footnotes":""},"class_list":["post-57","page","type-page","status-publish","hentry","archive-entry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>System Monitoring Projects - D&amp;A Solutions<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"http:\/\/www.dasoluciones.es\/en\/services\/system-monitoring-projects\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"System Monitoring Projects - D&amp;A Solutions\" \/>\n<meta property=\"og:description\" content=\"&nbsp; Typically, a machinery asset condition monitoring project begins with the technical specification phase.&nbsp;It is followed by the design of the solution that best fits this specification, and then the selection of different hardware elements, which may come from one or multiple manufacturers.&nbsp;The implementation of the monitoring system is the next phase, which sometimes coincides...\" \/>\n<meta property=\"og:url\" content=\"http:\/\/www.dasoluciones.es\/en\/services\/system-monitoring-projects\/\" \/>\n<meta property=\"og:site_name\" content=\"D&amp;A Solutions\" \/>\n<meta property=\"article:modified_time\" content=\"2017-08-20T12:32:27+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"http:\/\/www.dasoluciones.es\/en\/services\/system-monitoring-projects\/\",\"url\":\"http:\/\/www.dasoluciones.es\/en\/services\/system-monitoring-projects\/\",\"name\":\"System Monitoring Projects - D&amp;A Solutions\",\"isPartOf\":{\"@id\":\"http:\/\/www.dasoluciones.es\/en\/#website\"},\"datePublished\":\"2017-07-03T13:53:35+00:00\",\"dateModified\":\"2017-08-20T12:32:27+00:00\",\"breadcrumb\":{\"@id\":\"http:\/\/www.dasoluciones.es\/en\/services\/system-monitoring-projects\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"http:\/\/www.dasoluciones.es\/en\/services\/system-monitoring-projects\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"http:\/\/www.dasoluciones.es\/en\/services\/system-monitoring-projects\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"http:\/\/www.dasoluciones.es\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SERVICES\",\"item\":\"http:\/\/www.dasoluciones.es\/en\/services\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"System Monitoring Projects\"}]},{\"@type\":\"WebSite\",\"@id\":\"http:\/\/www.dasoluciones.es\/en\/#website\",\"url\":\"http:\/\/www.dasoluciones.es\/en\/\",\"name\":\"D&amp;A Solutions\",\"description\":\"Industry Solutions\",\"publisher\":{\"@id\":\"http:\/\/www.dasoluciones.es\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"http:\/\/www.dasoluciones.es\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"http:\/\/www.dasoluciones.es\/en\/#organization\",\"name\":\"D&amp;A Solutions\",\"url\":\"http:\/\/www.dasoluciones.es\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"http:\/\/www.dasoluciones.es\/en\/#\/schema\/logo\/image\/\",\"url\":\"http:\/\/www.dasoluciones.es\/en\/wp-content\/uploads\/sites\/2\/2017\/07\/cropped-logo_15x150.png\",\"contentUrl\":\"http:\/\/www.dasoluciones.es\/en\/wp-content\/uploads\/sites\/2\/2017\/07\/cropped-logo_15x150.png\",\"width\":150,\"height\":78,\"caption\":\"D&amp;A Solutions\"},\"image\":{\"@id\":\"http:\/\/www.dasoluciones.es\/en\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"System Monitoring Projects - D&amp;A Solutions","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"http:\/\/www.dasoluciones.es\/en\/services\/system-monitoring-projects\/","og_locale":"en_GB","og_type":"article","og_title":"System Monitoring Projects - D&amp;A Solutions","og_description":"&nbsp; Typically, a machinery asset condition monitoring project begins with the technical specification phase.&nbsp;It is followed by the design of the solution that best fits this specification, and then the selection of different hardware elements, which may come from one or multiple manufacturers.&nbsp;The implementation of the monitoring system is the next phase, which sometimes coincides...","og_url":"http:\/\/www.dasoluciones.es\/en\/services\/system-monitoring-projects\/","og_site_name":"D&amp;A Solutions","article_modified_time":"2017-08-20T12:32:27+00:00","twitter_card":"summary_large_image","twitter_misc":{"Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"http:\/\/www.dasoluciones.es\/en\/services\/system-monitoring-projects\/","url":"http:\/\/www.dasoluciones.es\/en\/services\/system-monitoring-projects\/","name":"System Monitoring Projects - D&amp;A Solutions","isPartOf":{"@id":"http:\/\/www.dasoluciones.es\/en\/#website"},"datePublished":"2017-07-03T13:53:35+00:00","dateModified":"2017-08-20T12:32:27+00:00","breadcrumb":{"@id":"http:\/\/www.dasoluciones.es\/en\/services\/system-monitoring-projects\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["http:\/\/www.dasoluciones.es\/en\/services\/system-monitoring-projects\/"]}]},{"@type":"BreadcrumbList","@id":"http:\/\/www.dasoluciones.es\/en\/services\/system-monitoring-projects\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"http:\/\/www.dasoluciones.es\/en\/"},{"@type":"ListItem","position":2,"name":"SERVICES","item":"http:\/\/www.dasoluciones.es\/en\/services\/"},{"@type":"ListItem","position":3,"name":"System Monitoring Projects"}]},{"@type":"WebSite","@id":"http:\/\/www.dasoluciones.es\/en\/#website","url":"http:\/\/www.dasoluciones.es\/en\/","name":"D&amp;A Solutions","description":"Industry Solutions","publisher":{"@id":"http:\/\/www.dasoluciones.es\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"http:\/\/www.dasoluciones.es\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"http:\/\/www.dasoluciones.es\/en\/#organization","name":"D&amp;A Solutions","url":"http:\/\/www.dasoluciones.es\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"http:\/\/www.dasoluciones.es\/en\/#\/schema\/logo\/image\/","url":"http:\/\/www.dasoluciones.es\/en\/wp-content\/uploads\/sites\/2\/2017\/07\/cropped-logo_15x150.png","contentUrl":"http:\/\/www.dasoluciones.es\/en\/wp-content\/uploads\/sites\/2\/2017\/07\/cropped-logo_15x150.png","width":150,"height":78,"caption":"D&amp;A Solutions"},"image":{"@id":"http:\/\/www.dasoluciones.es\/en\/#\/schema\/logo\/image\/"}}]}},"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/P9EQGy-V","_links":{"self":[{"href":"http:\/\/www.dasoluciones.es\/en\/wp-json\/wp\/v2\/pages\/57","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.dasoluciones.es\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/www.dasoluciones.es\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/www.dasoluciones.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.dasoluciones.es\/en\/wp-json\/wp\/v2\/comments?post=57"}],"version-history":[{"count":8,"href":"http:\/\/www.dasoluciones.es\/en\/wp-json\/wp\/v2\/pages\/57\/revisions"}],"predecessor-version":[{"id":373,"href":"http:\/\/www.dasoluciones.es\/en\/wp-json\/wp\/v2\/pages\/57\/revisions\/373"}],"up":[{"embeddable":true,"href":"http:\/\/www.dasoluciones.es\/en\/wp-json\/wp\/v2\/pages\/40"}],"wp:attachment":[{"href":"http:\/\/www.dasoluciones.es\/en\/wp-json\/wp\/v2\/media?parent=57"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}