{"id":57,"date":"2017-07-03T13:53:35","date_gmt":"2017-07-03T13:53:35","guid":{"rendered":"http:\/\/www.dasoluciones.es\/en\/?page_id=57"},"modified":"2017-08-20T12:32:27","modified_gmt":"2017-08-20T12:32:27","slug":"system-monitoring-projects","status":"publish","type":"page","link":"https:\/\/www.dasoluciones.es\/en\/services\/system-monitoring-projects\/","title":{"rendered":"System Monitoring Projects"},"content":{"rendered":"<h6 align=\"justify\">&nbsp;<\/h6>\n<hr>\n<p align=\"justify\">Typically, a machinery asset condition monitoring project begins with the technical specification phase.&nbsp;It is followed by the design of the solution that best fits this specification, and then the selection of different hardware elements, which may come from one or multiple manufacturers.&nbsp;The implementation of the monitoring system is the next phase, which sometimes coincides with the final phase which consists of commissioning and training.<\/p>\n<p align=\"justify\"><strong><em>At D&amp;A we participate in all phases of monitoring, if required by the client or the project.<\/em><\/strong>&nbsp;However, we also participate in isolated or concrete phases, depending on the needs in each case.&nbsp;In the design phase, the generation of good documentation in terms of detail, wiring and assembly plans, test procedures, etc.&nbsp;is essential to avoid delays and problems during start-up.&nbsp;For D&amp;A, the start-up or implantation begins with the FAT factory tests (Factory Acceptance Test).&nbsp;Proper design of the tests will allow problems that may arise during the SAT (Site Acceptance Test)&nbsp; to be anticipated before start-up tests.&nbsp;For us, these are aspects of special relevance in all the projects in which we are involved.<\/p>\n<p align=\"justify\">&nbsp;<\/p>\nngg_shortcode_0_placeholder\n<p align=\"justify\">&nbsp;<\/p>\n<p align=\"justify\"><strong><em>We are convinced that<\/em><\/strong>&nbsp; &nbsp;<strong><em>it is the small details that make the implementation of a monitoring system simple and meet the objectives of a project, so we devote special attention to&nbsp;<\/em><\/strong><em><strong>these<\/strong>.<\/em><\/p>\n<p align=\"justify\">The condition monitoring systems in which we work on can be large, such as the monitoring of the waterworks of the Victoria Falls in Zambia, with more than 70 channels;&nbsp;or small, such as the monitoring of one or two measurement directions in a bearing of a machine.&nbsp;In&nbsp;<em>both<\/em>&nbsp;cases,&nbsp;<strong><em>the quality of work as the fulfillment of the objectives of the project is a priority for the people at D&amp;A.<\/em><\/strong>&nbsp;<strong>We<\/strong>&nbsp;<strong><em>do not establish differences between large and small systems, each one is given maximum dedicated&nbsp;<\/em><\/strong><em><strong>attention<\/strong>.<\/em><\/p>\n<p align=\"justify\">Sometimes a project requires the design of a solution or the creation of a prototype tailored for the collection and evaluation of the data to be analyzed.&nbsp;At D&amp;A we also assume this type of challenge.&nbsp;<em><strong>The<\/strong><\/em>&nbsp;<strong><em>integration of hardware components and software design solutions based on LabView<\/em><\/strong>&nbsp;<strong><em>are&nbsp;just&nbsp;one of the products that&nbsp;we&nbsp;offer to our customers<\/em><\/strong> for asset monitoring solutions and industrial processes.<\/p>\n<hr>\n<p align=\"justify\">&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; Typically, a machinery asset condition monitoring project begins with the technical specification phase.&nbsp;It is followed by the design of the solution that best fits this specification, and then the selection of different hardware elements, which may come from one or multiple manufacturers.&nbsp;The implementation of the monitoring system is the next phase, which sometimes coincides&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":40,"menu_order":3,"comment_status":"closed","ping_status":"closed","template":"","meta":{"ngg_post_thumbnail":0,"footnotes":""},"class_list":["post-57","page","type-page","status-publish","hentry","archive-entry"],"_links":{"self":[{"href":"https:\/\/www.dasoluciones.es\/en\/wp-json\/wp\/v2\/pages\/57","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dasoluciones.es\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.dasoluciones.es\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.dasoluciones.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dasoluciones.es\/en\/wp-json\/wp\/v2\/comments?post=57"}],"version-history":[{"count":8,"href":"https:\/\/www.dasoluciones.es\/en\/wp-json\/wp\/v2\/pages\/57\/revisions"}],"predecessor-version":[{"id":373,"href":"https:\/\/www.dasoluciones.es\/en\/wp-json\/wp\/v2\/pages\/57\/revisions\/373"}],"up":[{"embeddable":true,"href":"https:\/\/www.dasoluciones.es\/en\/wp-json\/wp\/v2\/pages\/40"}],"wp:attachment":[{"href":"https:\/\/www.dasoluciones.es\/en\/wp-json\/wp\/v2\/media?parent=57"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}